Home › value › weq_2

Christmas Tree (WEQ_2)

DGIF baseline 2026-1, the latest. Earlier baselines: timemap.

RDF: weq_2.ttl

Name
christmasTree
Attribute
WEQ Well Equipment
Definition
An assembly of valves, spools, pressure gauges and chokes fitted to the wellhead of a completed well to control production.
Description
The christmas tree also incorporates facilities to enable safe access for well intervention operations such as slickline, electric wireline or coiled tubing. Its function is to both prevent the release of petroleum or gas from a well into the environment and also to direct and control the flow of formation fluids from the well. When the well is ready to produce petroleum or natural gas, valves are opened and the release of the formation fluids is allowed through a pipeline leading (eventually) to a refinery.
Accepted
2013-10-18
Allowed for

Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.