Home › value › wbs_8

Plugged (WBS_8)

DGIF baseline 2026-1, the latest. Earlier baselines: timemap.

RDF: wbs_8.ttl

Name
plugged
Attribute
WBS Wellbore Status
Definition
The well has permanently ceased production or the borehole ceased serving its intended function and has been plugged.
Description
Different regulatory bodies have differing requirements for plugging operations, typically requiring that cement plugs be placed and tested across any open hydrocarbon-bearing formations, across all casing shoes, across freshwater aquifers, and perhaps several other areas near the surface, including the top 6 to 15 metres (20 to 50 feet) of the wellbore.
Accepted
2013-10-18
Allowed for

Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.