Home › value › sfs_4
Good Estimated (SFS_4)
DGIF baseline 2026-1, the latest. Earlier baselines: timemap.
RDF: sfs_4.ttl
- Name
goodEstimated
- Attribute
- SFS Aerodrome Pavement Functional Status
- Definition
- It is estimated (in lieu of reported information) that the condition is adequate for sustained aircraft operations.
- Description
- It is estimated that it will support 30 days of sustained operations by the heaviest (highest Load Classification Number (LCN) or Aircraft Classification Number (ACN)) aircraft that can use the facility.
- Accepted
- 2013-10-18
- Allowed for
- ZI019 Aerodrome Pavement Information
Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.