Home › value › rpt_1
Anchor Pattern (RPT_1)
DGIF baseline 2026-1, the latest. Earlier baselines: timemap.
RDF: rpt_1.ttl
- Name
anchorPattern
- Attribute
- RPT Air Refuelling Procedure Type
- Definition
- A prescribed pattern, established by air refuelling points, along which air-to-air refuelling of aircraft is performed.
- Description
- Air refuelling anchor patterns are usually shaped like an oval racetrack.
- Accepted
- 2013-10-18
- Allowed for
- GA520 Air Refuelling Procedure
Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.