Home › value › con_29
Prepared Watercourse Crossing (CON_29)
DGIF baseline 2026-1, the latest. Earlier baselines: timemap.
RDF: con_29.ttl
- Name
preparedWatercourseCross
- Attribute
- CON Route Width Constriction Type
- Definition
- A location on a watercourse that has ramps, structural piles, and/or piers constructed on one or both shores to allow for suitable future crossing operations using floating bridges or rafting equipment.
- Description
- For example, a prepared float bridge site or a prepared raft site.
- Accepted
- 2013-10-18
- Allowed for
- AQ059 Transportation Route Characteristic Change
Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.