Home › value › asx_5

Unpaved (ASX_5)

DGIF baseline 2026-1, the latest. Earlier baselines: timemap.

RDF: asx_5.ttl

Name
unpaved
Attribute
ASX Aerodrome Movement Area Surface Category
Definition
The surface has been prepared (for example: by grading or rolling) but has not been paved.
Description
Generally considered to be only temporary in nature as unless regularly maintained the surface relatively rapidly degrades as a result of weathering and traffic. Non-local materials (for example: gravel or landing mats) may be used to improve the load-bearing and wear characteristics of the surface.
Accepted
2013-10-18
Allowed for

Source: DGIF 2026-1 QEA model, DGIWG. Standard: DGIWG 206-3. Licence: CC BY 4.0, © DGIWG.